-
「工业门扭簧」半垂直提升门扭簧上劲方法
"Industrial Door Torsion Spring" Semi-vertical Lifting Door Torsion Spring Stiffening Method
根据厂房门洞的大小,工业门的提升门方式可分为转折提升、垂直提升两种,而垂直提升方式又有完全垂直和半垂直之分。
According to the size of workshop doors, the lifting ways of industrial doors can be divided into turning lifting and vertical lifting, while the vertical lifting ways can be divided into completely vertical and semi-vertical lifting.
不论是何种提升门方式,平衡弹簧的设置都至关重要。今天,工业门配件厂家就来和大家聊聊垂直提升工业门的平衡扭簧设置要求。
Regardless of the way of lifting door, the setting of balance spring is very important. Today, the manufacturer of industrial door accessories comes to talk with you about the requirements of balanced torsion spring setting for vertical lifting industrial door.
一、完全垂直提升工业门
I. Complete vertical lifting of industrial doors
平衡扭簧承受着统一重量的工业门门体,因此要想使扭簧扭力和工业门门重相平衡,只有改变轮径的大小,故而这就需要安装塔轮。
The balance torsion spring bears the same weight of the industrial door body, so in order to balance the torsion of the torsion spring and the weight of the industrial door, only the size of the wheel diameter can be changed, so the tower wheel needs to be installed.
在安装完全垂直提升工业门的扭簧时,要注意预紧。
When installing the torsional spring of the fully vertical lifting industrial door, attention should be paid to pre-tightening.
一般来说,钢丝绳的长度要根据塔轮线盘来确定,要保证提升门门体开启到顶部时,钢丝绳在塔轮上从大圈到小圈全部绕满。
Generally speaking, the length of the wire rope should be determined by the tray wheel. When the lifting door body opens to the top, the wire rope will be fully wrapped from the big circle to the small circle on the tray wheel.
「工业门扭簧」半垂直提升门扭簧上劲方法
"Industrial Door Torsion Spring" Semi-vertical Lifting Door Torsion Spring Stiffening Method
二、半垂直提升工业门
2. Semi-vertical lifting industrial door
与完全垂直提升门不同,半垂直提升工业门的塔轮只需要半塔轮就能使扭簧扭力和门重保持平衡状态
Unlike fully vertical lifting doors, the tower wheels of semi-vertical lifting industrial doors need only half of the tower wheels to keep the torsional spring torsion and gate weight in balance.
这样以来,当工业门垂直提升门用的是半塔轮的塔轮部分,当工业门门上滑提升时用的是半塔轮的平轮部分。
In this way, when the vertical lifting door of the industrial door uses the tower wheel part of the half tower wheel, and when the industrial door slides upward, the wheel part of the half tower wheel is used.
同样,在安装半垂直提升工业门的扭簧时同样也需要事先预紧,不同的是钢丝绳的缠绕方法。
Similarly, when installing the torsional spring of the semi-vertical lifting industrial door, it also needs to be pre-tightened in advance. The difference is the winding method of the wire rope.
在缠绕钢丝绳时,先从半塔轮的大圈绕到小圈,注意要绕满。
When winding the wire rope, first from the big circle of the half tower wheel to the small circle, pay attention to the full circle.
然后继续绕在半塔轮的平轮上,至于平轮上钢丝绳的圈数要根据门体上滑部分的提升高度来确定,不知道要缠绕多少圈数的需要事先咨询专业技术人员。
Then continue to wrap on the half tower wheel. As for the number of circles of wire rope on the flat wheel, it should be determined according to the lifting height of the sliding part of the door body. We do not know how many circles to wrap, we need to consult professional and technical personnel beforehand.
如您需采购提升门配件,欢迎与我们的客服人员联系,本公司支持全国配送上门,免费指导安装。
If you need to purchase lifting door accessories, please contact our customer service personnel. Our company supports the nationwide distribution of door-to-door, free installation guidance.
「工业门扭簧」半垂直提升门扭簧上劲方法
作者:工业门扭簧批发 时间:2019/7/3 16:29:43- 工业推拉门配件-购买平移门配件自己做大门 23-03-27
- 工业门配件厂家批发-电动提升门配件 22-11-29
- 工业折叠门-厂房电动折叠门定做 22-09-22
- 工业推拉门配件-平移门吊轮吊轨批发 22-09-01
相关新闻: